Great progress at Shiplake College Boathouse
The new boathouse and activity centre, in a beautiful position on the Thames, is due to be ready for use at Easter 2020 . The steel frame was erected in front of a sheet-piled retaining wall with a composite steel deck at the first floor. The cladding is currently being installed.

