New build 10 storey 220 bed hotel, above 4 storey John Lewis retail unit.
This is a major steel framed structure with cantilever ends. This project presented challenging architectural design and tight programme to open for London 2012 Olympics.
New build 10 storey 220 bed hotel, above 4 storey John Lewis retail unit.
This is a major steel framed structure with cantilever ends. This project presented challenging architectural design and tight programme to open for London 2012 Olympics.
Simpson Associates Consulting Engineers LLP
Company Number OC351954. | 8 Friday Street, Henley On Thames, Oxfordshire, RG9 1AH
All Content and Images Copyright 2025
