top of page

Phase 2 at The Forum, Gloucester

The Forum, the major redevelopment of Gloucester city centre, has been designed to make a lasting contribution to the community and have a positive environmental impact. Following our involvement in the first phase, we are now progressing with the second phase. We are pleased to have had a key role in enabling this next phase of works through our design for the diversion of an existing watercourse. We have also designed the structures of the second phase to minimise the volume of concrete and maximise the amount of cement replacement used in construction. Both these measures dramatically reduce the amount of embodied carbon in the structure. Great to be working with Reef Group, Gloucester City Council and Kier.


39 views0 comments

Recent Posts

See All

Our London office has moved!

From today, Monday 25th March, you will find our London office at : 4th Floor, Devonshire House 60 Goswell Road London EC1M 7AD Tel: 0207 253 2626 This new office gives us plenty of space to continue

bottom of page